Alba
Installation of 121 horse bays comprising of treated pine stud work in between structural steel and sheeted with plywood with a hardwood capping.
Built
Installation of 1950, 25mm thick plywood sheets onto structural steel.
Baulderstone
Installation of recycled hardwood to boardwalks and toilet block.
Brookfield Multiplex
- Auburn Hospital - Stage 1
Hoardings, site accommodation, demolition of existing plant rooms.
CBG
Installation of external cladding James Hardy Scyon.
Dream Constructions
- Old Arnott's factories North Strathfield
2000m2 of bearers, joists and yellow tongue flooring.
Hansen Yuncken
- John Paul Village Heathcote stage 1
Construction of 10 covered walkways comprising of timber frame work, roof sheets, gutters, down pipes, FC linings and mouldings & 10 roofs to the top of lift shafts.
Hooker Cockram
Installation of bearers, joists, yellow tongue & CFC flooring to the top of the new grand stand (news, commentators, function rooms).
Resicom Constructions
Carpentry works to $14million house comprising of timber ceilings, decks and screens.
Total Constructions
Installation of hand rails and timber deck.
Watpac
Timber roof to terrace kitchen, blackbutt, pergola & decking to covered dining, spotted gum timbers to main entry stair & miscellaneous day labour.
PO Box 3043 Lansvale NSW 2166